The basement floor is now poured-Monday, Dec. 5, 2016, temperature 39 degrees

The pumper truck was needed again due to the muddy conditions...one of the concrete trucks got stuck in the mud and could not get close enough to dump in the concrete...
 Pouring in the concrete, then evening and smoothing it out, making sure it is perfectly even and flat is a labor intensive process...

The piece of machinery is a large trowel the workers use to get a smooth finish on the concrete. Accelerant has been added so the wet concrete will set up quickly, before the rain comes..