Framing of the roof!!!!
Featured Post
Friday, January 13, 2017
Friday, January 6, 2017
15 degrees out as I am walking up to the house my feet fall through the ice and become soaking wet!
Starting to get the concept of just how grand (and big!) this house is going to be!
Made it to the burn barrel which was still hot!
A lot has been accomplished this first week of January 2017 despite the sub-freezing temperatures and snow.
Tiny sliver of a moon in the upper left hand corner...
Tuesday, January 3, 2017
Framing did not begin on Monday, December 12, or the following Monday either due to the weather. The floor joists were started on December 23rd, and the sub-floor was in not long after. The raising of the frame began on Friday, December 30th, on a beautiful but cold clear blue sky day.
Here you see the west wall frame in position and in the foreground the all important burn barrel where I have taken refuge to keep warm. Leed certification encourages the burning of waste material if possible rather than throwing into the dumpster. It also is a vital source of warmth to workers on a cold day, though these guys were sweating due to the physical labor required to assemble and then raise the frames.
Here you can see the second section of the west wall has been raised. From this you can start to get an idea of how grand the house is going to be.
The first section of the front wall (the north side of the house) is now in position.
As the sun goes down we see Benito's (or Martine's?) shadow in what will be the front window of the house. Progress, slow but sure. We are hoping to be under roof by the end of next week (second week of January, 2017). Then the next phase begins-working on the inside.