Sunday, May 28, 2017

More finishing touchs

Barn doors on the study

Fan in master

Fan in guest BR

Fan in study

Framed in opening in study letting in the light from the clerstory windows

Gas line going in





Friday, May 26, 2017

Tile going in in kitchen

According to Robert the inside will be finished in the next couple of weeks.Can't wait.

Monday, May 8, 2017

Deb finds art in a box of nails.

 Which color for the steps? Solid Oak steps to the basement.
 Appliances lined up in their boxes ready to be installed.
Fridge temporarily in place
Thanks Lowes delivery guys! You do great work.

Quick trip to Europe-right outside our window.

We will soon be leaving the bliss of this view.

Tuesday, May 2, 2017

Trench is dug!

 This trench will contain the buried lines for gas, electric, phone, cable, sewer and water
most of the siding done in the back

Monday, May 1, 2017

The end is near.....we hope.

More sand has arrived---to be used in the trench that will be dug by...


This baby who arrived today on a huge truck and moved on tank tracks.
Most important for us....don't hurt the tree!

Monday, April 24, 2017

Siding and trim

 Hardie plank cement fiber siding..
 and trim
It's green, right?

Saturday, April 22, 2017

Sweat equity is messy


 Sweat equity
The wood is so beautiful!
Kitchen cabinets going in
 Father and sons putting on the outside siding and trim. George, Aldoalberto and Jorge.

Monday, April 17, 2017

New UTILITY pole with new transformer to bring electric to the property

You do not call it a telephone pole, Robert informs me. Cincinnati Bell actually rents space on the utility pole for their phone lines. Duke Energy installs the new pole with the new transformer, then cuts the pole down to just above where the telephone lines are attached. The phone company then has to come out and transfer their equipment and lines to the new pole. Then Duke takes down the rest of the pole. They extend lines down the pole to about 6 ft above the ground, then our electrician takes our lines up the pole to that level, then Duke again comes out to connect the lines. Trenches will then be dug to bury the lines underground, then attach to the house. Then we go live with power! Wow, what a process, all of this for our one little house in the woods!

Sunday, April 16, 2017

Step by step....

 Fireplace stone completed..
 and exterior stone
Starting installation of the hardwood floor---Robert is doing it himself....

Thursday, April 13, 2017

Stone for the front outside


 Concrete prep
 The wall behind which the rain barrels will be hidden
Stone with deep stacked appearance, no grout

Fireplace stone going in


 Concrete prep
Artists at work!

Drywall priming and painting

 Deb and I helped do the cutting in for the primer (in the closets anyway!)